我想要一个Java程序来计算两个日期之间的天数。

输入第一个日期(德语表示法;有空格:"dd mm yyyy") 输入第二个日期。 程序应该计算两个日期之间的天数。

我怎样才能把闰年和夏天时包括进来呢?

我的代码:

import java.util.Calendar;
import java.util.Date;
import java.util.Scanner;

public class NewDateDifference {

    public static void main(String[] args) {

        System.out.print("Insert first date: ");
        Scanner s = new Scanner(System.in);
        String[] eingabe1 = new String[3];

        while (s.hasNext()) {
            int i = 0;
            insert1[i] = s.next();
            if (!s.hasNext()) {
                s.close();
                break;
            }
            i++;
        }

        System.out.print("Insert second date: ");
        Scanner t = new Scanner(System.in);
        String[] insert2 = new String[3];

        while (t.hasNext()) {
            int i = 0;
            insert2[i] = t.next();
            if (!t.hasNext()) {
                t.close();
                break;
            }
            i++;
        }

        Calendar cal = Calendar.getInstance();

        cal.set(Calendar.DAY_OF_MONTH, Integer.parseInt(insert1[0]));
        cal.set(Calendar.MONTH, Integer.parseInt(insert1[1]));
        cal.set(Calendar.YEAR, Integer.parseInt(insert1[2]));
        Date firstDate = cal.getTime();

        cal.set(Calendar.DAY_OF_MONTH, Integer.parseInt(insert2[0]));
        cal.set(Calendar.MONTH, Integer.parseInt(insert2[1]));
        cal.set(Calendar.YEAR, Integer.parseInt(insert2[2]));
        Date secondDate = cal.getTime();


        long diff = secondDate.getTime() - firstDate.getTime();

        System.out.println ("Days: " + diff / 1000 / 60 / 60 / 24);
    }
}

当前回答

最好的方法,它转换为一个字符串作为奖励;)

protected void onCreate(Bundle savedInstanceState) {

    super.onCreate(savedInstanceState);
    setContentView(R.layout.activity_main);
    try {
        //Dates to compare
        String CurrentDate=  "09/24/2015";
        String FinalDate=  "09/26/2015";

        Date date1;
        Date date2;

        SimpleDateFormat dates = new SimpleDateFormat("MM/dd/yyyy");

        //Setting dates
        date1 = dates.parse(CurrentDate);
        date2 = dates.parse(FinalDate);

        //Comparing dates
        long difference = Math.abs(date1.getTime() - date2.getTime());
        long differenceDates = difference / (24 * 60 * 60 * 1000);

        //Convert long to String
        String dayDifference = Long.toString(differenceDates);

        Log.e("HERE","HERE: " + dayDifference);
    }
    catch (Exception exception) {
        Log.e("DIDN'T WORK", "exception " + exception);
    }
}

其他回答

最简单的方法:

public static long getDifferenceDays(Date d1, Date d2) {
    long diff = d2.getTime() - d1.getTime();
    return TimeUnit.DAYS.convert(diff, TimeUnit.MILLISECONDS);
}
// date format, it will be like "2015-01-01"
private static final String DATE_FORMAT = "yyyy-MM-dd";

// convert a string to java.util.Date
public static Date convertStringToJavaDate(String date)
        throws ParseException {
    DateFormat dataFormat = new SimpleDateFormat(DATE_FORMAT);
    return dataFormat.parse(date);
}

// plus days to a date
public static Date plusJavaDays(Date date, int days) {
    // convert to jata-time
    DateTime fromDate = new DateTime(date);
    DateTime toDate = fromDate.plusDays(days);
    // convert back to java.util.Date
    return toDate.toDate();
}

// return a list of dates between the fromDate and toDate
public static List<Date> getDatesBetween(Date fromDate, Date toDate) {
    List<Date> dates = new ArrayList<Date>(0);
    Date date = fromDate;
    while (date.before(toDate) || date.equals(toDate)) {
        dates.add(date);
        date = plusJavaDays(date, 1);
    }
    return dates;
}
public static String dateCalculation(String getTime, String dependTime) {
    //Time A is getTime that need to calculate.
    //Time B is static time that Time A depend on B Time and calculate the result.

    Date date = new Date();
    final SimpleDateFormat sdf = new SimpleDateFormat("yyy-MM-dd H:mm:ss");
    Date dateObj = null;
    Date checkDate = null;

    try {
        dateObj = sdf.parse(getTime);
    } catch (ParseException e) {
        e.printStackTrace();
        return "0";
    }
    SimpleDateFormat dateFormat = new SimpleDateFormat("HH:mm:ss");

    String checkInDate = dateFormat.format(dateObj).toString();
    Date defaultTime = null;
    try {
        defaultTime = dateFormat.parse(dependTime);
        checkDate = dateFormat.parse(checkInDate);
    } catch (ParseException e) {
        e.printStackTrace();
        return "0";
    }

    try {
        if (dateFormat.parse(dateFormat.format(date)).after(defaultTime)) {
            long diff = checkDate.getTime() - defaultTime.getTime();
            Log.e("Difference", "onBindViewHolder: Difference: " + dateObj + " : " + defaultTime + " : " + diff);
            if (diff > 0) {
                long diffSeconds = diff / 1000 % 60;
                long diffMinutes = diff / (60 * 1000) % 60;
                long diffHours = diff / (60 * 60 * 1000);

                return "Late: " + diffHours + " Hour, " + diffMinutes + " Minutes, " + diffSeconds + " Sec";
            } else {
                return "0";
            }
        }
    } catch (ParseException e) {
        e.printStackTrace();
        return "0";
    }
    return "0";
}

Use:

public int getDifferenceDays(Date d1, Date d2) {
    int daysdiff = 0;
    long diff = d2.getTime() - d1.getTime();
    long diffDays = diff / (24 * 60 * 60 * 1000) + 1;
    daysdiff = (int) diffDays;
    return daysdiff;
}

当夏令时到来时,大多数/所有答案都给我们带来了问题。下面是我们针对所有日期的工作解决方案,不使用JodaTime。它利用日历对象:

public static int daysBetween(Calendar day1, Calendar day2){
    Calendar dayOne = (Calendar) day1.clone(),
            dayTwo = (Calendar) day2.clone();

    if (dayOne.get(Calendar.YEAR) == dayTwo.get(Calendar.YEAR)) {
        return Math.abs(dayOne.get(Calendar.DAY_OF_YEAR) - dayTwo.get(Calendar.DAY_OF_YEAR));
    } else {
        if (dayTwo.get(Calendar.YEAR) > dayOne.get(Calendar.YEAR)) {
            //swap them
            Calendar temp = dayOne;
            dayOne = dayTwo;
            dayTwo = temp;
        }
        int extraDays = 0;

        int dayOneOriginalYearDays = dayOne.get(Calendar.DAY_OF_YEAR);

        while (dayOne.get(Calendar.YEAR) > dayTwo.get(Calendar.YEAR)) {
            dayOne.add(Calendar.YEAR, -1);
            // getActualMaximum() important for leap years
            extraDays += dayOne.getActualMaximum(Calendar.DAY_OF_YEAR);
        }

        return extraDays - dayTwo.get(Calendar.DAY_OF_YEAR) + dayOneOriginalYearDays ;
    }
}